The time required for the production of a single product generally consists of the actual machining time, when the tool and workpiece interfere with each other to eject chips, and the machining preparation time, when the tool is changed and the workpiece is attached and removed. In the case of cutting, it is given by dividing the cutting volume to be removed per product by the product of feed, depth of cut, and cutting speed.